当前位置:新励学网 > 语言作文 > 土木工程的一段话翻译成英语,求大神解答,可提高悬赏

土木工程的一段话翻译成英语,求大神解答,可提高悬赏

发表时间:2024-07-12 06:50:35 来源:网友投稿

1,inthedrawingofprestressedsteelbeam,corrugatedpipesizeinmillimeters,therestweremeasuredincentimeters.

FromtheYcoordinate2,steelbeamasthecenterofsteelbeamtobeambottom.

3,steelwirestrandstandardtensilestrengthFPK=1860MPa,tensioncontrolstress0.75fpk=1395MPa.

4,thetensionsequenceisN3-N2-N1,thesamenumberofwebsteelbeamatthesametimetension.

5,reinforcedandprestressedconflict,appropriatemovingordinaryreinforcingbarposition.

6,theconstructionshouldbefrictiontest,testpositionandquantityintheconstructionaccordingtotheactualsituationtodetermine.

Theamountofelongationofsteelbeaminthetableis7,accordingtothefollowingparameters:

ThesteelwireelasticitymodulusoftheE=1.95*10MPa,u=0.17,k=0.0015

Duringtheconstructionofprestressedtensionshouldbetomeetthedesignstrengthofconcretestrengthandage90%inlessthan5days

Beforedoing.Prestressedbytensionandextensionofdualcontrol,thetension,theamountofextension

Check.Extendedrangeerroris+6%,otherwise,shouldidentifythereasons.

8,accordingtotheneedtosettheanchorbackingplate,atadistanceof1mtocompletethepretension,bending;bendingradiusofnotlessthan

10m,andtheneedtoensurethattheanchorbackingplateandsteelbeaminthevertical.

9,constructionofthewebsteelbeamandcorrugatedpipelengthshouldbeadjustedaccordingtothecorrespondingdelta.

10,energy-savingeffectinboxgirderwebbeamendbendingattheturningpointofleftandright60cm,pitch15cmlayout.

免责声明:本站发布的教育资讯(图片、视频和文字)以本站原创、转载和分享为主,文章观点不代表本网站立场。

如果本文侵犯了您的权益,请联系底部站长邮箱进行举报反馈,一经查实,我们将在第一时间处理,感谢您对本站的关注!